Home » Categories » Multiple Categories |
Increment Document Date at Set Time |
Article Number: 44 | Rating: Unrated | Last Updated: Wed, Jun 14, 2023 at 5:01 PM
|
Datafile Software Increment Document Date at Set Time Order processing documents, particularly on the Sales Order side, are usually processed at today’s date. In some organisations at a particular point in the day – often relating to delivery collections – documents will need to be processed with the next day’s date and the operator must remember to update this date and, if exit from the document process, remember to set again each time the document is opened. This new feature allows the setting of a system time at which to clock on to tomorrows date and also, optionally, skip weekends and bank holidays. Installation Document Design Parameters
The configuration settings for the new ‘increment date’ option are included within the document design. To update select Installation from the main menu followed by, if Diamond or Premier, the option Application Manager and then Document Design Manager. Professional users should select Installation from the main menu and then Document Design Manager. Select Sales Order Documents or Purchase Order Processing as required and then select the document type before entering the number of the document you wish to update. Once the document mask is displayed select the Parameters option at the top of the
screen before selecting the ACTION button to move to screen 12 – Optional
Features before clicking NEXT to
move to screen 12a. Use Today’s Date – the document date defaults to the system date which is usually today’s date but can be overridden by dates used in other options, setting this option forces the document to default to today’s date. Clock on to next day at what time – enter the time in 24hr format at which to default the document to tomorrows date – i.e. 1545 / 1630 / etc. When Clock On, Ignore Saturdays – if today’s date is a Saturday or Friday after the clock on time the system will, if set, ignore Saturdays and skip to the next day. Ignore Sundays – similar to above but will (also) skip Sunday. Ignore Bank Holidays – similar to above but will also skip Bank Holidays. Note however that the system uses the C29DATES.TXT file to determine which dates are bank holidays (this file is used with the special ‘!C29’ calculation option to determine the duration between two dates/times). When setting this option the system will warn if this file not found. C29DATES.TXT This file is a text file that can be maintained with any text editor (Notepad / WordPad etc.) which is created with a fixed layout in the DFCOMP location (usually \DFWIN\DATA). Its primary use is to calculate durations between start and end date/times but is now also used for this new feature to clock on the document date. The text file is formatted in a specific layout as below: Line 1 – Flag if ignoring Saturdays in time calculations – Y or N Line 2 – Flag if ignoring Sundays in time calculations – Y or N Line 3 – Start of Working Day Line 4 – End of Working Day Lines 5-19 – records dates to be omitted from time calculations (bank holidays / firm closedowns etc.). The format is DD/MM/YY but all lines must be entered and if no date required set as XX/XX/XX. An example layout would therefore be: Y Y 0900 1700 01/01/10 02/01/10 16/04/10 19/04/10 01/05/10 31/05/10 25/08/10 24/12/10 25/12/10 31/12/10 XX/XX/XX XX/XX/XX XX/XX/XX XX/XX/XX XX/XX/XX |
Attachments
There are no attachments for this article.
|
Copy Items from Account to Order Header
Viewed 29 times since Tue, Oct 15, 2024
Order Call Off’s – Twice Monthly Frequency
Viewed 5 times since Tue, Oct 22, 2024
Order Entry – Set Detail Pick Mode Input Sequence for Extra Items
Viewed 8 times since Thu, Oct 24, 2024
Header Optional 3
Viewed 1562 times since Wed, Jul 4, 2012
Remove Redundant Orders - Application User Facilities
Viewed 1505 times since Wed, Jul 4, 2012
Sales/Purchase Order Header File – Item Screen Design
Viewed 1062 times since Wed, Jul 4, 2012
Status – Amend an Order Status
Viewed 740 times since Tue, Jul 3, 2012
Default Nominal on Order Details from Account
Viewed 1571 times since Tue, Jun 12, 2012
Revalue a Currency Order
Viewed 1273 times since Tue, Jul 3, 2012
Operational Considerations
Viewed 1352 times since Tue, Jul 3, 2012
|