Home » Categories » Solutions by Business Process » Production

Update Works Order / Create New Stock Record Maintenance Screens

Datafile Software

Update Works Order / Create New Stock Record Maintenance Screens

When entering works order details the option is available, subject to configuration, to create a new stock record. When creating a new stock record Bill of Materials uses its own separate screen design. As these are separate screen layouts they can be ‘left behind’ when amendments are made to the main entry screens. New in Release 6.5 you can set the BOM system to use the standard stock maintenance screens in preference to the applications ‘internal’ screens.

In addition the Works Order entry screens can be configured to offer different options when updating a works order as opposed to adding a works order.Often these screens are configured identically resulting in amendments being made in two separate places. New in Release 6.5 you can set the BOM system to use the same screen as the add action when updating a works order.

Installation

Application User Facilities

To enable the ‘create new’ options to use the standard stock maintenance screens new options have been added within the Application User Facilities for Bill of Materials. To update select Installation from the main menu followed by Application Manager and then Application User Facilities. Select the Bill of Materials application and then the option Enter/Amend Orders before selecting the Create New Stock/Record procedure.


Use the same screen(s) as configured for Stock Control – set to use the standard maintenance screens for creating new stock records, leave blank to continue to use the BOM screen. Once confirmed, if set, the system returns you to the menu or, if left blank, to the screen design for the BOM screen.

To enable the system to use the same screen for updating works orders as when adding works orders select the option to Amend / View Works Order Header.


Use the same screen(s) as for adding new orders – set to enable the system to use the standard maintenance for both adding and updating works orders, leave blank to continue to use the separate update screen. Once confirmed, if set, the system returns you to the menu or, if left blank, to the screen design for the update screen.

Custom Fields
  • Release ID: 6.5
Attachments Attachments
There are no attachments for this article.
Related Articles RSS Feed
Document Parameters - Document Design Manager
Viewed 2260 times since Wed, Jul 4, 2012
Automatic Documents - Abandon if Insufficient Component Stock
Viewed 77 times since Thu, Mar 19, 2026
System Profiles
Viewed 1690 times since Wed, Jul 4, 2012
Printing the Document and Updating Files
Viewed 2125 times since Wed, Jul 4, 2012
Remove Orders by Date
Viewed 1614 times since Wed, Jul 4, 2012
Order Enquiry
Viewed 1496 times since Wed, Jul 4, 2012
Works Order Specification
Viewed 1683 times since Wed, Jul 4, 2012
Controls & Audit Manager
Viewed 1901 times since Wed, Jul 4, 2012
Moving, Deleting and Amending Items - Document Design Manager
Viewed 1869 times since Wed, Jul 4, 2012
Stock Images within Pick / Build Documents
Viewed 1955 times since Mon, Nov 25, 2013