Home » Categories » Solutions by Business Process » Production |
Header Information |
Article Number: 1596 | Rating: Unrated | Last Updated: Wed, Jun 14, 2023 at 4:51 PM
|
Datafile Software Header Information Order RefAfter selecting the document layout you are asked for the works order reference you wish to process. <F4-Select> is available to search if required. DateDefaults to the ‘system’ date although may be overtyped (which is then remembered as the system date for next process). This date will be validated according to the current stock period and some warnings may be displayed when outside this date range. If this message is displayed then the date entered is more than one period in advance of the current stock period and thus not allowed.Press <Enter> and re-enter date within the current period. If this message is displayed then the date entered is in the next stock period. Select whether you wish to post to this date or not. Note the effect on quantity of forward transactions would not be included (by default) in the stock valuation report. If this message is displayed then the date entered is earlier than the current stock period. Select whether you wish to post to this date or not. Note other than the date of the transaction itself posting to a previous period has no affect – demand etc. is updated for the current period. Document NumberDisplays the next in the incremental number sequence for this document and, by default, cannot be overwritten. Stock CodeDisplays the stock code being built (view-only). QuantityAsks for the quantity the works order print is to be processed for – usually defaulting to the outstanding to be built. Note – on the build document if the assembled stock item is serial/batch tracked and one or more of the components are serial/batch tracked then you cannot build more than one batch/serial at a time to maintain traceability. On build documents if the quantity processed is less than that outstanding you may be prompted, depending on document configuration, if you wish to leave the remaining quantity on back-order or write-off the remainder and complete the works order – respond as required. Batch CodesIf the finished item is batch/serial tracked then you will be prompted, on a build document, for the batches to be built. Note that if any component is batch/serial tracked and the finished item is also batch/serial tracked then you will only be able to build one batch / serial at a time to maintain traceability. Keying <ESC> at any point in the entry of the order header information will take you firstly back to the order reference input, allowing you to select another works order. A second <ESC> at this point will ask whether you wish to ‘Abandon this Document’. Reply ‘Yes’ or ‘No’ accordingly. |
Attachments
![]() There are no attachments for this article.
|
Extra File Scans
Viewed 1571 times since Wed, Jul 4, 2012
Works Order Header File ITEM Screen Design
Viewed 1489 times since Wed, Jul 4, 2012
Fax Printing - Document Design Manager
Viewed 1576 times since Wed, Jul 4, 2012
Changing Order Details
Viewed 1370 times since Wed, Jul 4, 2012
System Profiles
Viewed 1421 times since Wed, Jul 4, 2012
Control Completion of Works Order
Viewed 1385 times since Wed, Jun 13, 2012
Launch Other Programs
Viewed 1589 times since Wed, Jul 4, 2012
Display of Component Details
Viewed 1726 times since Wed, Jul 4, 2012
System Status
Viewed 1283 times since Wed, Jul 4, 2012
Database INI Settings
Viewed 1563 times since Wed, Jul 4, 2012
|