| Home » Categories » Multiple Categories |
Change Order References |
|
Article Number: 347 | Rating: Unrated | Last Updated: Wed, Jun 14, 2023 at 5:22 PM
|
|
Datafile Software Change Order References Two new features have been added to change order references. The first allows change on a global basis based on an external database; the second allows changes to be made on an order-by-order basis. Global Change Order ReferencesThis procedure operates in a similar manner to the equivalent option within the sales and purchase ledgers. A ‘change’ database, maintained via the Desktop or ProFiler, records two items – the existing reference and the new reference. When the option is selected you are asked to select this database before the system proceeds to change the order references as detailed within the database. Change Order References IndividuallyThis procedure allows you to amend order references individually, asking for the order reference you wish to amend and the new reference required. Notes Both options require an exclusive lock of the order header and detail databases. If prefixing the order reference with the customer/supplier account code as a ‘contract ref’, then the system will offer to update the account code based on the amended order reference. InstallationMenu DesignTo add the new options you need to amend the order processing menu’s to call the parameters for the additional features using the CONFIG sign-on. The parameter numbers are: 7811 – Global Change of Order References 7812 – Change Order Reference Global Change DatabaseIf wish to use the option to globally change order references, then you need to create a new database and the ability to maintain this file. You can create a new database via the DataFiler Database Utilities. The change database is a fixed structure file with two items – the current order reference and the new reference. No Item Name Type Description 1 CURR-ORDNO X (16) Prime-index of the change database, this item holds the current value of the order reference. 2 NEW-ORDNO X (16) This item holds the value of the new order reference. |
Attachments
There are no attachments for this article.
|
Copy Items
Viewed 2366 times since Wed, Jul 4, 2012
Change Forward Order Status
Viewed 2495 times since Tue, Jul 3, 2012
Prompt to Show Account / Stock History
Viewed 2205 times since Mon, Jun 11, 2012
Compact & Audit Database
Viewed 2178 times since Wed, Jul 4, 2012
Sales/Purchase Order Header File – Item Screen Design
Viewed 1641 times since Wed, Jul 4, 2012
Document Control Databases
Viewed 2298 times since Tue, Mar 3, 2020
Change Account on Sales / Purchase Order
Viewed 2742 times since Fri, Jun 8, 2012
Purchase Order Batch Update
Viewed 1904 times since Tue, Jul 3, 2012
Omit Print of Account Items on Documents
Viewed 2157 times since Wed, Jun 13, 2012
Change Active Orders Back to Quotes
Viewed 483 times since Thu, Oct 17, 2024
|

