Home » Categories » Solutions by Business Process » Stock Control and Batch Tracking

Batch Optional 2 - Batch Tracking

Datafile Software

Batch Optional 2 - Batch Tracking

BOM ON-ORDER QTY K, L, M Holds the quantity on-order through Bill of Materials

BOM RESERVED QTY K, L, M Holds the quantity reserved through Bill of Materials

WORKS ASSEMBLY

WORKS ORDER REFERENCE X (16) Where the batch record was built through Bill of Materials this item contains the works order number it was built on.

WORKS BUILD REFERENCE X (6) Where the batch record was built through BOM this contains the build reference.

WORKS DATE D, E Where the batch record was built through BOM this contains the build date.

WORKS COMPONENT

WORKS ORDER REFERENCE X (16) Where the batch record was issued through BOM this contains the works order number.

WORKS BUILD REFERENCE X (6) Where the batch record was issued through BOM this contains the build reference

WORKS DATE D, E Where the batch record was issued through BOM this contains the build date.

Custom Fields
  • Release ID: Standard
Attachments Attachments
There are no attachments for this article.
Related Articles RSS Feed
Average Cost Updating - Replace Cost if Stock Cost is Zero
Viewed 2287 times since Fri, Jun 8, 2012
System Status - Stock Control
Viewed 1931 times since Tue, Jun 19, 2012
Recalculate Cost of Assemblies - Stock Control
Viewed 2184 times since Mon, Jun 18, 2012
Application Screen Layouts - Stock Control
Viewed 2196 times since Tue, Jun 19, 2012
Stock Record and Stock Transaction Pick Lists
Viewed 18225 times since Fri, Jun 8, 2012
Assembly Maintenance – Select Alternate Part References
Viewed 223 times since Tue, Oct 22, 2024
Delivery / Goods Received Note - Batch Tracking
Viewed 3218 times since Tue, Jun 19, 2012
Selective Extra Batch Input Items
Viewed 2368 times since Wed, May 18, 2016
Build Assembly (Physical) - Stock Control
Viewed 2426 times since Mon, Jun 18, 2012
Select Key Definition - Stock Control
Viewed 2203 times since Tue, Jun 19, 2012