Home » Categories » Solutions by Business Process » Stock Control and Batch Tracking

Batch Optional 2 - Batch Tracking

Datafile Software

Batch Optional 2 - Batch Tracking

BOM ON-ORDER QTY K, L, M Holds the quantity on-order through Bill of Materials

BOM RESERVED QTY K, L, M Holds the quantity reserved through Bill of Materials

WORKS ASSEMBLY

WORKS ORDER REFERENCE X (16) Where the batch record was built through Bill of Materials this item contains the works order number it was built on.

WORKS BUILD REFERENCE X (6) Where the batch record was built through BOM this contains the build reference.

WORKS DATE D, E Where the batch record was built through BOM this contains the build date.

WORKS COMPONENT

WORKS ORDER REFERENCE X (16) Where the batch record was issued through BOM this contains the works order number.

WORKS BUILD REFERENCE X (6) Where the batch record was issued through BOM this contains the build reference

WORKS DATE D, E Where the batch record was issued through BOM this contains the build date.

Custom Fields
  • Release ID: Standard
Attachments Attachments
There are no attachments for this article.
Related Articles RSS Feed
View Current Period Dates - Stock Control
Viewed 1852 times since Mon, Jun 18, 2012
List Assemblies - Stock Control
Viewed 1921 times since Mon, Jun 18, 2012
Stock Checking Sheet - Stock Control
Viewed 2426 times since Mon, Jun 18, 2012
Replicate a Stock Record - Stock Control
Viewed 1806 times since Mon, Jun 18, 2012
Trans Mandatory - Stock Control
Viewed 1881 times since Tue, Jun 19, 2012
Location File - Stock Control
Viewed 1825 times since Tue, Jun 19, 2012
Security and User Manager - Batch Tracking
Viewed 1797 times since Tue, Jun 19, 2012
Update Last Sale / Purchase Dates with Assembly Build
Viewed 380 times since Wed, Oct 16, 2024
Stock Assemblies - Stock Control
Viewed 1985 times since Mon, Jun 18, 2012
Copy Batch Items to Stock Transactions
Viewed 1930 times since Fri, Jun 8, 2012