If Stock Items and/or Assemblies configured for wastage calculations then, during build processes, the system calculates the values including the wastage but the options to recalculate cost of assemblies and the print/value assemblies report doesn’t include the cost of wastage. A new parameter has been added to the Stock System Profiles to allow the wastage to be included in these options.
Installation
System Profiles
To
update the profiles select Installation from the main menu followed by Application
Manager and System Profiles. Select the Stock Control application and the new option is available on the
third parameter screen.
Apply Wastage in Print/Value and Recalc Costs – set this option to include any defined wastage when running the Print/Value Assemblies Report and the Recalculate Cost of Assemblies.
Article ID: 27
Created On: Fri, Jun 8, 2012 at 11:35 AM
Last Updated On: Thu, Jun 22, 2023 at 11:38 PM
Online URL: https://kb.datafile.co.uk/article/assemblies-include-wastage-in-valuations-27.html