Assemblies - Include Wastage in Valuations

If Stock Items and/or Assemblies configured for wastage calculations then, during build processes, the system calculates the values including the wastage but the options to recalculate cost of assemblies and the print/value assemblies report doesn’t include the cost of wastage. A new parameter has been added to the Stock System Profiles to allow the wastage to be included in these options.

Installation

System Profiles

To update the profiles select Installation from the main menu followed by Application Manager and System Profiles. Select the Stock Control application and the new option is available on the third parameter screen.


Apply Wastage in Print/Value and Recalc Costs – set this option to include any defined wastage when running the Print/Value Assemblies Report and the Recalculate Cost of Assemblies.


Custom Fields

Article ID: 27
Created On: Fri, Jun 8, 2012 at 11:35 AM
Last Updated On: Thu, Jun 22, 2023 at 11:38 PM

Online URL: https://kb.datafile.co.uk/article/assemblies-include-wastage-in-valuations-27.html