Home » Categories » Solutions by Business Process » Production

Works Order Header File FULL Screen Design (Premier Only)

Datafile Software

Works Order Header File FULL Screen Design (Premier Only)

In Premier systems you have the option to create a user-define screen in which to display details from the works order header over two screens. On selection of this option you are asked if you wish to use a full screen layout and, if selected, you are taken into the design for the first screen.

You design the screen as per the standard screen design procedures. To enter text on the screen position the cursor where you want to start entering the text, by clicking the mouse, and then type in the text required. To clear text use the spacebar to blank it out, use of the delete key will remove the character and bring any text later on the line one character closer. If press <Insert> then text entry changes to INSERT rather than OVERTYPE mode.

To draw lines on the screen switch to ‘Line Mode’ using the option on the Tools menu and use the mouse to draw a line by clicking at its start position and then drag the cursor to where you want it to finish (only horizontal/vertical lines allowed). To delete a line click it with the mouse (so that it’s highlighted) and then press the <Delete> key. To switch back to ‘Text’ mode call the option on the Tools menu again. A special option on the Tools pull-down allows you to quickly draw a screen border.

To position a data item click the starting position where you wish to display and then either right-click with the mouse or press <F4-Select> key – the available items are then displayed.

Once complete choose the File pull-down option ‘Save & Exit’. When you save the first screen you will be asked if you wish to use a second screen – respond as required.

Custom Fields
  • Release ID: Standard
Attachments Attachments
There are no attachments for this article.
Related Articles RSS Feed
Stock Images within Pick / Build Documents
Viewed 2090 times since Mon, Nov 25, 2013
Automatic Documents - Abandon if Insufficient Component Stock
Viewed 188 times since Thu, Mar 19, 2026
Application Manager
Viewed 2002 times since Wed, Jul 4, 2012
Works Order Replication
Viewed 1520 times since Mon, May 16, 2016
Display of Component Details
Viewed 2046 times since Wed, Jul 4, 2012
List Order Details
Viewed 1672 times since Wed, Jul 4, 2012
Print/Build Works Order
Viewed 1625 times since Wed, Jul 4, 2012
Set Application Code Formats
Viewed 1964 times since Wed, Jul 4, 2012
Moving, Deleting and Amending Items - Document Design Manager
Viewed 1963 times since Wed, Jul 4, 2012
Stock Picking Sheet
Viewed 1982 times since Wed, Jul 4, 2012