| Home » Categories » Solutions by Business Process » Utilities |
Post Code Analysis |
|
Article Number: 394 | Rating: Unrated | Last Updated: Wed, Jun 14, 2023 at 4:19 PM
|
|
Datafile Software Post Code Analysis It can be useful to analyse (say) sales by post code but with the varying lengths of post codes – for example Liverpool is ‘L’, some London areas are ‘EC’, you can’t create a standard item for analysis unless you manually entered these details into a separate data item. This new feature allows you the option to create two sub-items based on the post code that will enable this analysis. The first, PC-MAIN, takes the initial letters of the post code, the second PC-BREAK, takes the first part of the post code. Example Post Code PC-MAIN PC-BREAK
CH41 5AZ CH CH41 L3 4BD L L3 EC1M 9RT EC EC1M Whichever item you require can then be used for sorting and subtotalling in your reports. Installation To use either of these options requires you create a sub-item in a database containing a post code (such as the sales accounts file). The data items need to be created with the detail below. Item Name Type Description PC-MAIN = Sub-item of the post code, starting at position 1 with a size of two characters. If the second character is a number then this is replaced with a blank. PC-BREAK = Sub-item of the post code, starting at position 1 with a size equal to the length of the post code field itself. |
Attachments
There are no attachments for this article.
|
Calling a Batch Update Definition - Profiler
Viewed 2194 times since Thu, Jul 5, 2012
Batch Update Processing - Stock Batch Update
Viewed 2353 times since Thu, Jul 5, 2012
Email Alerts - Set ‘From’ Email Account
Viewed 326 times since Thu, Jan 9, 2025
Customer Price Checker and Quantity Breaks
Viewed 13479 times since Mon, Nov 25, 2013
User Defined Reports - Set ‘From’ Address on Email Reports
Viewed 444 times since Thu, Jan 9, 2025
Confirm Date for Generated Orders - Order Processing Batch Updates
Viewed 1967 times since Thu, Jul 5, 2012
Data Interchange Omit First Row from Import
Viewed 2952 times since Fri, May 27, 2016
Report Specification - Job Costing Batch Update
Viewed 2173 times since Thu, Jul 5, 2012
Selection Criteria Range ‘Value’ Input
Viewed 2773 times since Fri, May 27, 2016
Increased Options Allowed on the Main Menu
Viewed 719 times since Thu, Jan 9, 2025
|

